Was suppose to design/build this for Lisa last year but boat had priority. No airplane classes last week so finally got this project off my to do list. Almost done, but temps dropping too low for final painting. Took way longer (maybe 40 hours) to make – lots of parts, and lots of time experimenting with design configs.

Design Requirements – About Average Details!

Top and Box Frame Sized For Space Limits

Shorty Legs To Keep Comfortable Working Height As Designing

Iteration 1 – But Lisa Wanted Another Shelf

Iteration 2 – Another Shelf Mocked Up

Ready For Sanding Etc…

Assembled, Epoxy Coated, Painting When Weather Warms Again

Done, Just Need To Move To Deck