Couple of things needed to get done before winter arrives.

  1. Replace all trim and roof/overhang around garage door (DONE)
  2. Move firewood again (4’th time) – back here since much better sun and ventilation compared to North side of garage (DONE)
  3. Trim board next to side door need repair
  4. Replace 2×8 cap on fence – broken by tree guy (DONE)

We don’t have the luxury of nice winters here so everything needs to be done by end of October else…