After allowing 10 days for epoxy coating to full harden, final sanding done. It took approximately 8 hours to do this. Moved everything outside, started with 80 grit on block just to find high spots. Switched to Bhaco scrapper and got majority runs/drips removed. Worked from “120-180-240-320” grits with water washing between. Used Makita orbital and it worked great. Hull back inside (with my new air filter system) and varnishing to be started in morning.

Getting Ready To Sand Fill Coats Smooth

Rails – Most Difficult To Smooth Out – Top/Bottom Overlap

1st Pass With 120 Grit

Top With Initial 120 Grit Completed

Back Inside For Final Varnishing – sanded to 320 grit